The Nile Valley (Wadi El Nil) Co. for Land
Development

The Green Belt Project in the 6th of October city, including studying the irrigation of the green belt area of the city using the treated effluent and groundwater. The responsibilities include investigating the water resources available from the ground water aquifers, in addition to hydro-geological and geological surveys and the possibility of providing the area with electric power, pumps and irrigation networks.