The High Dam & Aswan Reservoir General
Authority / Ministry of Water Resources and
Irrigation

Project for studying the rehabilitation of Aswan reservoir lock gates, including the required electrical works for operation, also comprehensive survey of all available supplies and equipment, design of required appropriate gates and valves, in addition to studying the electrical operation system of the gates and valves, by considering all safety measures for the personnel, the environmental regulations in addition to economic feasibility study.