The General Civil Aviation Authority, King Abdel
Aziz International Airport, Jeddah

Rehabilitation and raising the capacity of the drinking water and sanitation, irrigation, firefighting and AC networks of King Abdel Aziz International Airport, Jeddah

The project aims at studying the current condition of the five networks and conducting an integrated study and hydraulic analysis to determine the efficiency of the networks to accommodate the future expansions which aim at doubling the accommodating capacity of the airport. The works include formulating an urgent and a long-term plan coupled with the detailed design of the required works and developing the GIS system to match the general system, thus allowing for developing and introducing any modifications to the system. The project was completed in February 2016.