Nile Valley Co. for Cement

Project for the establishment of the water intake, including pumping stations with capacity 140 m3 / hour to pump water from the Nile to the site of the tanks, in addition to the construction of a water carrier pipelines for a length of about 12.5km with the necessary technical protection works for the line and station.